Incoming inspection: what to check, in what order, and what to write down

A goods-in check that takes twenty minutes per lot catches the failures that cost a shift. The order of the checks matters as much as the checks themselves.

First checkdocuments match batch
Thendimensions on the fed part
Thenflatness after a day
Finallydraw a few parts

At a glance

Specification at a glance

CheckMethodAcceptance to write into the procedure
DocumentsMatch label reference to mill certificate and inspection recordEvery lot traceable, no missing reference
ThicknessMicrometer at three points across the partWithin the stated tolerance, recorded per lot
Diameter or sizeCaliper or template on a sample of piecesWithin the drawing tolerance on the fed part
FlatnessSurface plate, 24 hours after receiptMillimetres over the part, stated per part size
SurfaceVisual under good light, both facesNo scratches deeper than the agreed limit, no roll marks on the cooking face
EdgeVisual and touch on a sampleNo burr that catches a glove, no separation visible at the edge
BondBend test on one piece, or ultrasonic if the file requiresNo opening at the interface
PackingCount per stack, interleaving, protectionMatches the packing specification
Draw trialThree to five parts in production toolingNo failure mode that the sample did not show

Documents first, because they gate the rest

If the label reference does not match the mill certificate, stop. Nothing else you measure can be attributed to a batch, and a quality file without traceability is a file that fails an audit later. This check takes two minutes and prevents the expensive version of the same problem.

Clad discs in a stack

Measure the part you feed the press

Thickness on the sheet and thickness on the disc are not the same measurement once the material has been cut and the stress released. Measure what goes into the press, at three points, and record it. This is also the measurement that settles arguments later, because the supplier's inspection record measured the same thing at their end.

Flatness needs a day

A stack that is flat on arrival can show dishing the next morning as the stress redistributes. Check on the surface plate after 24 hours, on pieces taken from the middle of the stack rather than the top, and record the figure. If it moves, you have a stress problem to raise with the supplier before the lot is consumed.

The five-part draw

Before releasing a lot to production, draw three to five parts in the real tooling. It costs minutes and tests the only thing the paperwork cannot: how this lot behaves under load. Record the failure mode if there is one, because the mode points at the cause: edge, anneal, gauge or tooling.

What to do when a lot fails

Quarantine, photograph, and report with the batch reference plus the measurement that failed. A supplier can act on "thickness 2.35 mm at three points, tolerance 2.4 to 2.5" and cannot act on "material seems thin". The record you took at goods-in is the whole argument.

Questions

Common questions

Do I need to inspect every lot?

Documents, dimensions and a visual check on every lot; flatness and a draw trial at least on the first lot and then on a sampling basis agreed with your quality team.

What if flatness fails after 24 hours?

Quarantine the lot, record the figure, and report it with the batch reference. Dishing is a stress and anneal issue, and the supplier can only act on the number.

Can I rely on the supplier's inspection record?

It is the starting point, not the acceptance. Your goods-in check is what protects your production line.

Which failure mode is most common?

Edge separation during drawing, usually traceable to edge quality or an under-annealed batch. Wrinkling at the flange points at the draw ratio or the tooling.

Should I keep a retained sample?

Yes, one piece per lot with its label. When a later batch behaves differently, the retained sample settles the comparison.